Renovation Contract in Singapore: What to Check Before You Sign
The quotation tells you what the work costs. The contract tells you what happens when something changes, runs late or goes wrong. Many homeowners skim it at the last meeting, sign, and only read it properly when there is a problem. Here is a plain checklist to go through before you sign, whether you are renovating a BTO, a resale HDB flat or a condo.
1. Who is signing, and for which address
The contract should name the company (not just a designer's personal name), its UEN, and the exact unit address.
For an HDB flat, the contractor must be listed on HDB's Directory of Renovation Contractors (DRC). HDB requires a DRC contractor for all renovations in your flat. You can check the listing on the HDB website before you sign.
The company you pay should be the same company named in the contract.
2. A scope of works you can actually check
A good contract points to a detailed scope: plans, drawings and specifications, with each item listed. Look for:
Every room and every major item, including hacking, masonry, carpentry, electrical, plumbing and painting
Materials and finishes named clearly, such as laminate code, tile size or countertop type, not just "standard"
What is excluded, so nothing is assumed
Small details you care about written down: power point positions, door swing direction, acceptable colour variation in tiles or laminates
The Consumers Association of Singapore (CASE) advises homeowners to make sure all verbal promises are documented in writing. If the designer said it, it should be in the contract or drawings. Our guide to renovation quotation red flags covers how to read the line items.
3. Start date, completion date and stages
Expected start and end dates, with the main stages in between
Who applies for permits. For HDB works that need approval, you authorise your DRC contractor to submit the application, and permitted works should not start until HDB issues the permit. See what needs an HDB renovation permit.
CASE suggests building in a buffer of one to three weeks for unforeseen delays, so plan your move-in date with that in mind.
4. Payment stages tied to real progress
The contract should show the contract sum and a payment schedule linked to milestones, not dates alone. Under CASE's CaseTrust scheme for renovation businesses, payments are collected in phases on agreed milestones and the initial deposit is capped at 20% of the total cost. Even if your firm is not accredited, that is a sensible benchmark. Read more in how to pay your renovation firm safely.
5. How changes (variations) are handled
Changes are normal. Disputes start when they are not written down. Check that:
Every variation is agreed in writing, with the cost and any time impact, before the work is done
Variation orders are signed by both sides and kept with the contract
Additional costs must be explained to you, not added at the final invoice
6. Warranty and defects
How long the workmanship warranty lasts and when it starts. The CaseTrust standard renovation contract gives a 12-month workmanship warranty from the completion date.
How to report a defect and how soon it will be fixed
What is not covered. CASE notes that natural features such as marble veining, reasonable differences between showroom samples and the actual product, and owner-supplied materials may be excluded.
See renovation warranty and defects after handover for what to do once you move in.
7. Handover documents and final payment
The contract should say what you receive at completion: warranty cards, user manuals and after-sales contacts. CASE recommends making the final payment only after rectification works are completed and documents are received. Our renovation handover checklist helps with the walkthrough.
8. What happens if there is a dispute
Look for a clear process: who you contact first, how complaints are handled, and what happens if you still cannot agree. CaseTrust-accredited renovation businesses must have a defined dispute resolution process, including mediation by the CASE centre if needed. Find out what CaseTrust renovation accreditation means for you.
Where Blackwoods Interior stands
Blackwoods Interior Pte. Ltd. (trading as Blackwoods Interior), UEN 201909521M
CaseTrust accredited for Renovation Businesses (the standard tier, not Gold), valid through 28 April 2028
Listed on HDB's Directory of Renovation Contractors (DRC)
Design and build for HDB flats and condos
Talk to Blackwoods Interior
Want a second pair of eyes before you sign? Book a free 30-minute consultation: WhatsApp us at 8754 3212 (Mon-Sat, about 10:00-19:00 SGT) or email Hello@bwi.sg. Visit www.bwi.sg to see more.
This guide is general information, not legal advice. Read your own contract in full and ask your renovation company to explain any clause you are unsure about.